Answer Posted / mahammedshaiik
i think 920kg per m3 and ur ans is
| Is This Answer Correct ? | 1 Yes | 4 No |
Post New Answer View All Answers
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
What tor stands for in tor steel?
how to calculate steel for slab or footings?
what radial pressure, the NP2 class rcc pipe can sustain?
how to calculate the size of triangular ring in rcc column?
why +1 to be followed for calculating the no of bars in BBS. Please explain
For Wet Mix Mecadam design what is Optimum moisture content
What are the different types of civil engineering?
Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted
How to calculate carrying capacity of the existing water supply trunkmain
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
What are your future hopes for this job?
why top layer of block work shoud be full size if any cut block adjustable than another layer?
Rate analysis of Vitrified tile in cement mortor 1:3
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38