Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why shear is not considered in limit state of serviceability??

Answer Posted / nandan kumar

design of concrete structure by limit state method is generally on two criteria (!)limit state of failure and (2) limit state of serviceability . the shear criteria is the consider in failure criteria because due to increase shear above permissible value the failure of structure will occur
.For this region shear design is not done for serviceability criteria

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Are cruise ships built for the transatlantic run?

1247


what is a well

1968


how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )

2728


the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C

2052


how can we construct building without foundation providing only grade beam at ground level

1688


how much of the strength comes from post-production curing

2761


how u design STAGING for Superstructure in BRIDGE construction?

2371


Why Should Curing Not Be Done By Ponding And Polythene Sheets?

1277


Difference between lime, distemper and plastic emulsion?

1734


20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u

2344


Hi my name is Binyam and I'm a 7th grader at Mayfield Woods Middle school. I decided to research civil engineering as my career and i need to know a few thing about your profession. What is your daily routine? What are some advantages and things you like about your job? What are some disadvantages What is the hardest thing you have done? What education have you gone through to become a civil engineer? How long is your work day? What is your work environment like? What is your salary? What made you want to become an engineer? What tools do you you use? Thank you for answering my questions

2319


In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

2258


how do you stabilize a waterlogged area in road construction

6775


What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??

2356


What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?

1096