Answer Posted / deshmukhcwm
it is drilling & grouting process for RCC work .
| Is This Answer Correct ? | 12 Yes | 3 No |
Post New Answer View All Answers
Difference between pre-tensioning and post-tensioning.
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.
How can explode a block?
plz.show development and anchorage length in simple diagram.
I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?
Did any of the egyptian pyramids ever fall down?
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
Write short note on construction programme for pile foundation.
residential buildings,mixing of concrete,structural,construction material,site handling.
How foundation is designed, Column design and beam design
what is mc arther pile?
How to design staircase.plz tell me formula for the design the staircase.
Explain how you can turn off the display for dimension in CAD?