Post New Answer View All Answers
What is meant by cartesian coordinate system?
what is civil enginnering & what you need of this course?
i need gate exam civil engineering question papers with answers
What is type failure of road surface? how to repair the failure of road surface?
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
what is work of planning deptt. in any construction compny (in road project)
Why are separation membranes used between concrete pavement slab and sub-base?
Which is the direction of negative angle?
What does civil status mean?
what are the Task work of different labour.?
Explain the various stages of the project planning process in construction?
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
How can we demolish concrete beams?