Answer Posted / piyush singh
Code of mixed design is " plain and reinforced cement is : 456 2000 "
| Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
detailed calculation of the amount of cement used?
What is horizon or horizontal mining?
how to calculate the scour depth
Why are separation membranes used between concrete pavement slab and sub-base?
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?
What are the important hardware systems used for cad?
What are the responsibilities of a construction manager?
What are the joints wants to made in masonry where door opening, arches like etc..
how many litres of enamel paint required for 5000 sft of site??
What is the use of array command?
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
3. What are the disadvantages of your present job, things you do not like about it?
The mixture of different ingredients of cement is burnt at?