how is calculate the developement length of column such like as L
Answer Posted / piyush singh
You want to ask the calculation of the Development length, Or we can say Ld (anchorage lenght)
Ans:- Generally anchorage length is given by the structural consultant in the general notes, but if not given you can calculate the same using the IS 456
Data you will need for the calculation are
1) Grade/Tensile strength of the steel
( FE415 , Fe 500, mild steel)
2) Diameter of the bar for which you want to calclate the anchorage length
3) Bond strength of the concrete, Tbd that again you will get from the IS456 based on the grade of concrete used,
Formula for the same is
Ld = (D*fs)/(4Tbd)
d= diameter of the bar
Fs= Tensile strength of the bar
Tbd= Permissible bond strenght of the concrete
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
Why the finite element method is lower bound solution?
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help
density of crush sand & crush stone or grit powder
afe or not
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
what is the coefficient for running feet to cft coversion both area and price
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
how to find hardness of water?why it should be determined?
what is column foundation
Wat is meant by Aecron brick?
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
insted of bentonite we can use any alternate material in piling ?
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?