Answer Posted / piyush singh
Spacer bar are used to maintain the depth of the bars as per the design, also the size of the spacer bar should be such that the coarse aggregate should pass between the two layers of the Rebars,
So if in concrete 20mm aggregate are used then spacer bar should be of 25mm size so that aggregates can easily pass through it
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
What are the advantages and disadvantages of using plastic and timber fenders?
que.is ideal size of bricnk use in india,joint size of mortar in massinary ,how many bricks used in 1cum.how to test at site.what is the possition of marka used in bricks?
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
pls tell me , what is the water content
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????
What is kn measurement?
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
What is Heavy Concrete & Normal Concrete
Detection of a beam & a girder areββββ
How much quantity of rod binding work by a rod binder per day