Answer Posted / shalender kumar
l/3
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how find the cut length of tringular ring and any formula find out the quantity of circular brick work
why the openings of sieves are square io size?
Which condition will prevail for the design of a swimming pool ? When the pool is empty or when it is filled ?
Define What is an ice dam sock?
crank types
how i convert mm into standard wire guage (SWG)no.
What are some structures that may be subjected to fatigue?
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
Permissible wastage of cement as per IS code ? In which IS code I get it?
Scaffolding IS code NO.
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
3. What are the disadvantages of your present job, things you do not like about it?
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??