in m25 concrete what is m.

Answer Posted / nanda kishor mallia

The comparative strenth of concrete after casting of 28 days.

Is This Answer Correct ?    2 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.

1779


What is thumb rule for deep trench excavation

1325


what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?

1782


WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT

2093


why building got air crack? if it get in one particular are what is means?

1958






How to find out kg per Sft ?

1812


Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.

1947


what will happen if one could not properly follow the spacing of slab reinforcement bar?

1578


My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).

2620


 What is difference between limit state and working stress method? How it is applies in building structure.

1776


if dia of slab beam bar is38mm what its clear cover any method of provide clear cover

1646


What is aggregate?

737


Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire

1156


how much cement and sand consuptin in 4 inch siporex walls 100 sq ft

2511


Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No.       Loading        Axial force      Moment     Shear 1               DL+LL          1950              600            20 2           Seismic load       250              4800          700

1530