Answer Posted / nanda kishor mallia
The comparative strenth of concrete after casting of 28 days.
Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
What is thumb rule for deep trench excavation
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
why building got air crack? if it get in one particular are what is means?
How to find out kg per Sft ?
Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.
what will happen if one could not properly follow the spacing of slab reinforcement bar?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
What is difference between limit state and working stress method? How it is applies in building structure.
if dia of slab beam bar is38mm what its clear cover any method of provide clear cover
What is aggregate?
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700