what"s the formula find the cement consumption for brick
work 12 thick wall 1 m2?
Answer Posted / dj_mgood
It's Depend on ratio of morter.
formula is very simple.
Quantity of wet material x 1.27 = Dry morter,
Example, let suppose wet material is 100cft then
100 x 1.27 = 127cft
requied material / some of ratio
if morter is 1:4 then
1/5 * 127 = 25.4 cft
25.4/1.25 = 20.32 say 21 bags
if thickness of plaster is 1/2" then it cover 508sft Area.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Define What is a projection line?
How do you calculate load bearing capacity of a waffle slab?
Discuss some applications of modular elasticity?
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
sir please send me campus placement questions in civil engineering
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
what is the difference between np2 and np3 concrete mix
What is the general specifications of a bituminous pavement road?
How and where are aqueducts built?
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
Stringer How many cm goes to landind
What is difference between combin footing & rapt footing
what is the basic difference between Coloumn & Shear Wall
How to calculate steel for beam slab and column