How to calculate no of 12 mm dia bars in a ton
Answer Posted / goutam giri
first of all u should know what is the length of each bar if it is 12 meters
12 (M)*0.888(UNIT WEIGHT) = 0.010656MT
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
rimmer in pile foundation
Define What is made from large rocks, which protects the base of cliffs?
how do you stabilize a waterlogged area in road construction
Why we provide hair pin for shed
Which is the direction for positive angle?
may i know the detailed description of cutting length
How do we calculate absolute pressure?
Calculation of curtain wall of box culvert
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
give me the mix proportion for design mix concrete M 7.5 grade 1:4:8
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet
What is the use of offset command?
Why is concrete cube test carried out?
What are some structures that may be subjected to fatigue?