Answer Posted / divusp
mild steel-hook 9d,bend-5d.
medium tensile steel-hook 11d,bend-5.5d.
cold twisted steel-hook 13d,bend-6d.
where d= dia of bar.
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
What is the difference between one-way slab and two-way slab?
Define What is a projection line?
What is the worlds largest concrete dam?
residential projects,structural.
What is geopolymer based concrete?
how to design and calculate materail quantity for concrete speedbreaker ?
What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.
What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
What is Refuse Area In High Rise Building ?
What is the Roll of Water Bonding under VDF road?
how to calculate valuation for the old building?
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
What is the difference between routing maintenance and major maintenance in school facilities?
What is meant by engineering drawing?