Answer Posted / shamshuddin
because co-efficient of friction between concrete and steel is same so steel is used in concrete..
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
What is quantity of cement and sand required for 2000sqft of tiling?
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
WHAT GOAL DO YOU HAVE IN YOUR CARRIER?
What out turn civil works
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
What Are The Steps Involved In The Concreting Process, Explain?
what is shuttering co efficient?
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
how to calculate quantity of bricks in circular manhole with examples.
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
What is dead load impact load live load
What are the composition of a landfill?
do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?
what is meant by residual strain?