Answer Posted / jatin patel
5 steps
1. voltage
2. freq.
3. phase angle
4. phase sequence
5. speed
| Is This Answer Correct ? | 2 Yes | 11 No |
Post New Answer View All Answers
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?
can dp type level transmitter work in under vaccum condition
How We Calibrate the vaccum transmitter?
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
what is the difference between compensated & normal drum level in boiler drum?
im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much
some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor
By any way can we increase the B check hours from 300 to 500
our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....
explain how the third harmonic content of the magnetising current affects transformer design
LAPT working in alternator / generator
why do you consider yourself a suitable candidate for this position
dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job
operation