Answer Posted / bilal
For a span = & > 6m
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What things architect have to take care of before starting any project?
how to calculate rate analysys of 1:6 plastering 10 sq m
what is the theoritical percentage of concrete cubes testing per day?
How do you calculate reinforcement weight of steel?
How much does the leaning tower of pisa lean?
what is the difference between replacement of cement by groundnut shell ash
Why nautical mile is different from statute mile?
Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
How to do base isolation using ETABS software?
How to take labor charges for construction of 1cum of concrete?
What are the common ways of demolition?
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil