Answer Posted / abiraj07
Brick=1600kg/m3
Cement=1440kg/m3
Challe=220kg/m3
Glass=2560=kg/m3
Lime stone=2650kg/m3
Sand stone=2800kg/m3
Steel =7850kg/m3
Timber=750-720kg/m3
Water=1000kg/m3
Is This Answer Correct ? | 10 Yes | 1 No |
Post New Answer View All Answers
Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?
What are the RISKS during the project construction?
what is diffrence between catchment area,watershed and basin?
Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method
What is unit weight of normal concrete?
How many Sft of Level Plaster per Kg
how to caliculate required amount of cement and sand required for 1cu.m.
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
Wat is meant by Aecron brick?
What in your past experience or education prepares you for the position for which you are applying
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
Describe the role of independent Quantity surveyor?