what is the productivity in aluminium shuttering per day
what is right & short method of measurement of slab&beam
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
Explain what are the problems one might face while having a Cantilever balcony?
Why is concrete cube test carried out?
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
What is the crank length in the slab?
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
Why are steel plates inserted inside bearings in elastomeric bearings?
how much tempareture are required to make liquid state of pid leed
pls tell me about method of cutting length of ties column
What is the difference between built area and super built up area?
how can calculate the compressive strength of concrete cylinder by water cement ratio ?
How much cement and sand required for 9"brick wall per square metre