Answer Posted / rdshah
There is no workability in the concrete. Generally it is used in precast work and road work.
| Is This Answer Correct ? | 3 Yes | 4 No |
Post New Answer View All Answers
as per is code, what is the minimum content of opc and ppc cement for rcc structure
what are the Task work of different labour.?
what is civil enginnering & what you need of this course?
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????
what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?
What is Critical path in Ms-Project ?
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work
What is the difference between undo & redo?
how much of the strength comes from post-production curing
why the openings of sieves are square io size?
what is kribs is supporting?
why does the most of civil engg is not intersted to going for teaching field?
Reinforcement details at hinged joint