At which place Construction joint should provide in slab
and Beam at the time of casting.
Answer Posted / alp
L/4 for Slabs and Beams
L/3 for Columns
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
what is pqc
How many mortar required for Brickwork of 1 Cu.m works??
how to take concrete quantity for precast segment for viaduct project?
what is moment-curvature relationship in semi rigid connections??
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?
How much of the strength of concrete comes from post- production curing?
what is the exact dia of 8swg and 10swg gabion wire
Explain what are the phases inspections are done by local authority while construction?
calculate the quantity of water for 1:6 cement mortar
Differentiate orthographic and isometric projections?
brickwork labour rate per cum ?
Howmuch bend to be provide for 200/600 BEEM
Why Vitrified tile are getting pop up.