Answer Posted / g.sagar
Hai this is Sagar.I have some pproblems.but I iinterested A ted in acting.plz give A chance.I prooved 100%.plz
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
RR masonry rate analysis
why demand factor less then 1 ?
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
What is meant by Crystal Concrete?
how to tie 10 legged stirrups
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
What is costing in 100squre feet bricks
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
what is parametre for M25 after 7 days strength
which red: used in roof teping, then use only cement
What is the outturn of Ceiling plastering
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.
What is the material consumption- cement,sand,tiles etc for Toilet dado?