Answer Posted / vasu
To solve the above question we use formula
d*d/162.2
d=20
.
. . d*d=20*20=400
.
. . 400/162.2=2.466kg/m
| Is This Answer Correct ? | 17 Yes | 13 No |
Post New Answer View All Answers
Why you are leaving present job?
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
How will be cutting in timber plate size 600*400 column size
What is pre-stressed concrete?
what is the basic difference between Coloumn & Shear Wall
In jack arch floor, the rise is kept?
Describe the sections included in a typical bill of quantities
How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight
Suppose you planning to paint newly fabricated workshop building made of structural steel of 10 tons total mass. How many litters paint primer for 1 coat and 2 coat of top coat?
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
what are the layers of the national and heir aprox thickness??
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
RR masonry rate analysis
Minimum and maximum size of the building components
sir please send me campus placement questions in civil engineering