why assay test and loss on drying test should be performed on
same day during raw material analysis??

Answer Posted / abhijit chanda

AS because the day when you are performing assay for raw material may have different LOD than other day. Its depend upon exposure or storage of raw material.

Example Sodium acetate, Sodium chloride etc.

Is This Answer Correct ?    2 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is co-chromatography?

714


i am doing a dissolution test then what is the rsd criteria for the six results obtained after calculation?is there any reference in any guideline for rsd criteria?

2678


What is laboratory centrifuges?

692


What is a positive control?

665


why single injection in related substance & dissolution but why not in assay ?

1585






What is dynamic range?

686


What is supernatant?

684


what would be the easiest way to make this compound, into something else, measurements please. (Lithopone, Sodium Fomate, Zinc Oxide, Soda ash

1736


what is your perception of a typical day for a pharmaseutical representative?

2032


plz send me previous model question paper for moh to my mail plz it's urgent my mail id is zeeta_lobo@yahoo.com

3961


if drug batch rejected in pharma industry thn what techniques are made to clear the batch?

2210


IN OOS SAMPLING ERROR HOW CAN WE ADDRESS , OR HOW CAN WE EXPLAIN AUDITOR ABOUT SAMPLING ERROR

2107


What are the steps you can take to avoid imbalance in centrifuge?

807


What are infectious diseases? How are they spread?

558


What clinical lab audit is and what are the areas you can do clinical audit?

705