Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

When to use Oil Transformer type and When to use Dry type?
What is the difference between both?

Answer Posted / dennis ortega dueñas

Dry Type transformers use air as the cooling medium. Oil Type transformers are considered a potential fire and safety hazard. Oil Type transformers require the development and maintenance of reliable fire safety and extinction procedures

Dry Type Transformers can be located closer to the load unlike oil transformers which require special location and civil construction for safety reasons. Locating the transformers near the loads may lead to savings in cable costs and reduced electrical losses.

Oil Type transformers may require periodic sampling of the oil and more exhaustive maintenance procedures.

However, though dry type transformers are advantageous, they are limited by size and voltage rating. Higher MVA ratings and voltage ratings may require the use of oil Transformers alone.

For outdoor applications, oil filled transformers are cheaper than dry types.

Is This Answer Correct ?    10 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

HELLO EVERYONE, I RECENTLY HAVE FOUND ONE PROBLEM, I WAS TAKING NO LOAD TRIAL OF AN HT MOTOR 920 MOTOR , 1440 RPM , 6.6 KV, WITH AUTO TRANSFORMER. AT 450 V, LOAD WAS 40 AMP AND SPEED WAS 250 RPM. BUT AS WE INCREASE VOLTAGE FROM 450 TO 480V, LOAD BECOME 41 AND SPEED REDUCED TO SOME RPM . SO WHICH PHENOMENON ACTED HERE FOR REDUCING SPEED.?? AND IS IT HAPPENING ALWAYS OR IT IS RARE? I ALSO HAVE FACED SUCH PROBLEM WITH FEW LT MOTOR ALSO.

1969


Why corona leads to production of Ozone and glow of the color VOILET?

1984


How much depth n width required for laying of 1X70 Sqmm Cable in Desert???

1619


how can calculation ate Amps for cabel. Ex-for 1sqmm wire hou many amps we can draw

2462


Graphs of measuring power and speed on dc motor

1967


Is it possible to protect 3phase overload and earth fault of the 3phase system using two CT's.

2124


We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible

1991


Why ground terminal is used in pot meter 10k ohms

1891


iam preparing for rrb section engineer post in electrical branch.suggest the right textbook for my reference.fromwhere i will get the previous q.papers?

2285


what happen if the supply is given to the stator of the 3phase induction motor with out assembling the rotor ?

1922


Define settling time.

1176


Draw the equivalent circuit of crystal oscillator?

1335


Generator,motor and alternator Working principal Please explain easily

1479


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

2032


what is meant by class 1 E in electrical power supply?

2120