How can i find number of brichs required for given quantity of wall in m^3..
Answer Posted / rickzing bhutia
If the quantity of wall is 1m^3 then first we have to find the quantity of one bricks 19x9x9cm convert into meter then divided by the 1m^3 lets do these.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
What is the l/d ratio of cantilever beam?
I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
Pls provide me with the calculation or codes related to de- shuttering of flat slabs
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
what is the maximum number of course that can be laid according to IS code and the max height.
Test procedure of fly ash bricks as per code ?
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
what's the formula for calculate pcc for matt(45mm aggregate)?
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
Minimum concrete cover in slabs, columns, beams, foundation and other st?
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
How do we calculate the power of centrifugal pump?