Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what are the differences between opc cement and ppc cement in
applications?

Answer Posted / divusp

OPC based on lime content, PPC is based on fly ash content.
OPC is used in small structure as PPC is sued in larger structure. 
OPC less heat than PPC while chemical reaction.
PPC required more curing then OPC
PPC set quiker than OPC
PPC available more grades than OPC.
PPC eco frindly as it is manufacturing from waste fly ash.
finally for residential its recommended OPC
for commercial /dam like it is recommended PPC.

Is This Answer Correct ?    3 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to marking the building

1883


How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?

1739


During reclamation how can the occurrence of mud waves can be rectified?

1251


Will going from a 3-tap to 6-tap increase water pressure?

1007


density of crush sand & crush stone or grit powder

6736


GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?

7283


What is semirigid connections?

2096


If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in

1960


how much one carpenter can doing shuttering of slab in one day

3289


What are the advantages of cad software?

1071


What is the crank length in the slab?

1012


what is the difference between tsp & tower

2312


Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.

2331


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2395


Define What is rigging?

1045