What will be compressive strength of bricks , Hollow blocks,
Solid blocks
Answer Posted / sundarapandiyan
bricks class 1=7.5 n/sqmm,
class 2= 4.5 n/sqmm,
class 3=3.0n/sqmm.
solid and hollow blocks, grade A= 3.5-7 n/sqmm.
grade B= 2-5 n/sqmm,
grade C=1.5 n/sqmm,
grade D=4-5 n/sqmm.
Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
What is costing in 100squre feet bricks
What is the standard volume of pharma in cub ft
What is the difference between one-way slab and two-way slab?
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.
i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
plumbing CPVC fitting FTE Brass full form
what is that one cub metre plaster in cemant and fine sand
explain five benefits of using standard terminology in the measurement process?
how to compute slab reinforcements on step by step procedures??