the amount which paid to contractor before starting work.
what does it calls?
Answer Posted / sundarapandiyan
"Mobilization advance" which is the contractor must utilize to mobilize the required resources to gear up the progress from initial stage.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
what is project?
how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
how much cost of single coat 20mm thick plastering per sqre meter
What is the crank length in the slab?
How to calculate steel for beam slab and column
For what building Built-on balconies are preferable? What are the advantages?
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
how to control PQI (Project Quality Index)
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
Formula of mid span bar
rate analysis for cement pointing 1:4 , for 100 sq m
Test procedure of fly ash bricks as per code ?