the amount which paid to contractor before starting work.
what does it calls?
Answer Posted / sundarapandiyan
"Mobilization advance" which is the contractor must utilize to mobilize the required resources to gear up the progress from initial stage.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Moisture content calculation for diff mix ratio's ??
how can calculate cutting length of diamond ring
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
how many cement used in single story residential building per sqft
Can we apply curing compound on ceiling (slab Bottom)
what does the track parameter mean in staad.pro?
why development length = 50D . why not 100D
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
in one SQM plaster how much Cement and sand consumed in ratio 1:4
What is the purpose of Chipping in the heavy foundation?
What does a construction cost covers and what does not?
What are wooden shingles?
Which architectural movement is also known as jazz moderna?
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.