how much nails used in 1 sq m shuttering
Answer Posted / sundarapandiyan
Shuttering qty = 6 X concrete qty
concrete qty= 0.2-0.5 X Buildup area
No of ply wood= 0.22 X shuttering area
nail in kg = 0.22 X shuttering area in sqm
oil 1 lit = 15 sqm coverage.
| Is This Answer Correct ? | 55 Yes | 2 No |
Post New Answer View All Answers
Differentiate first angle & third angle projection?
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
what is the difference between prime coat and tack coat in road construction
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
What is the difference between tor steel and tmt steel?
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
Rate analysis of Vitrified tile in cement mortor 1:3
What are the alternate material for steel, Sand and aggregate
What is costing in 100squre feet bricks
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
What is the difference between pvc,cpvc and upvc and where it is used as per their properties?????
as per is code, what is the minimum content of opc and ppc cement for rcc structure
What is the use of extruded feature in solidsworks?
water leak detection system question & answer