Answer Posted / siba
M- mix
Is This Answer Correct ? | 29 Yes | 2 No |
Post New Answer View All Answers
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
what is the use in canals of longitudinal drains and cross drains in lining areas?
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
how to calculate total cost for slab 35'×8'
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
What should be the standard roof height like to be?
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
How did the romans get water up hills using aqua ducts?
What is kn measurement?
What are the advantages of cad?
What is diversion tunnel in a dam?
Formula of area of crane hook
how much area can be platered by a mason for exterior
Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?