Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what if i want to lap a 20mm dia and a 16mm dia together wat
will be the lap length??
a) 1m
b) 80mm

Answer Posted / as.

When two bars of different dia lapped together, lap length is provided based on lower dia.
Here both both 20 & 16 mm used. So, lap length is based on 16 mm. Normally, we provide lap length 50 times dia of bar. So lap length in this case will be 800 mm.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

any book or article on pumped concrete.

2202


How to improve the strength of fly ash bricks to avoid corner damge? How to get the color lighter similar to normal concrete blocks/

1860


can you give me the details of rate analysis of steel and concrete?

2975


What is Time period of a building and its relation with frequency ?

1438


the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm

2350


Explain what is the difference between built area and super built up area?

1186


Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?

1863


WHAT THREE SPECFIC JOB POSITIONS TO YOU TARGET FROM THE COMPANY?

2033


How to calculate cement and river sand material Qty for waterproofing base coat and finish coat

2403


how to take the quantity of block work and plastering  1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate

2460


What is the tensile strength of marble?

1154


how pumping of concrete effects the quantity of material used in it?

1715


how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...

2365


what are the layers of the national and heir aprox thickness??

2124


Where is the worlds longest elevator and how long is it?

1149