During shutdown of Steam Turbine,How do we cross the
critical speed?
Answer Posted / m saqib
there is no control on coast down speed of turbine except vacume breaker.when turbine trip the steam stop valve should be closed.when turbine speed reaches 2800 rpm then we open the vacume breaker .then turbine speed reduce > than under vacume.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon
what is natural frequency of turbine shaft .
some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor
how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?
our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....
im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much
operation
We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
what does mean by kva rating
can dp type level transmitter work in under vaccum condition
what is the trip circuit supervision in an electrical meaning?
why do you consider yourself a suitable candidate for this position
Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.
procedure of how to generate power in solar plant.