Answer Posted / srikanth
As per the Particular drawing the Structural Engineer as give the Steel Requirement & spacing of the Particular steel on that basis we can calculated of the Steel.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
how to identify np3 pipe and np4 pipe
how much required strength of cement concrete bricks(size 230x115x75mm)
how to calculate MR 9(derivation)
How much cement is require in one sqft area in a G+3 residential construction.
Which tests are performed on soil to decide the type of foundation to be provided.
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
How long does it take concrete to harden?
What is the Null Point of chimney in Power Plant
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
Special thing in designing a overhead reservoir ? which is different from an ordinary design
what is the weight of 6000 psi concrete in lb/cft?
what is the formula to find the diagonal shape stirrups?
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
Define mirror?