Answer Posted / srikanth
As per the Particular drawing the Structural Engineer as give the Steel Requirement & spacing of the Particular steel on that basis we can calculated of the Steel.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What things architect have to take care of before starting any project?
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
WHAT IS YOUR CURRENT SALARY
What is meaning of tlc
What is the different type of slump test indications?
how many kg of 20mm, 10mm, dust available in one ton stone boulder
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method
Please let me know what is the simplest way of Calculating Mix Designs
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
why we use for testing of compression strength concrete the size of specimen 150x150x150. why we are not using another dimension like 100x150x100 uneven dimension.
What is the difference between absorption & adsorption and sorption?
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
What do you meant by gui?
Why should pumping be not used in case of concreting works?