how to calculate the volume of water in the water tank
(5'x5'x5')? what"s the formula?
Answer Posted / anil
one cubic meter is equal to 35.315 cubic feet. so one cubic
feet = 1/35.315 cubic meter = 0.0283 cubic meter
L=5'
w=5'
h=5'
V=L*W*H
=5'*5'*5'
=125 Cubic feet
125*0.0283
=3,538 cubic meter
=3,538 litres volume of water in the tank
Is This Answer Correct ? 38 Yes 4 No
Bert05
Answer
# 4 5'X5'X5'=125cu.ft
Is This Answer Correct ? 54 Yes 23 No
Sri
Answer
# 5 calculate the water tank volume in cuft.
1cuft = 28.32 liters
example : if u got the volume of water tank is 200cuft
then vol of water = 28.32 x 200 = 5664 liters
From the above u can understand that for every 100 cuft volume nearly 2832 liters of water is stored.
Is This Answer Correct ? 33 Yes 11 No
Bangaru Babu
Answer
# 6 Lenght=5'
Breadth=5'
Height=5'
Formula to be used..
volum=Lenght*Breadth*Height
volume=5'*5'*5'
volume=125cft
Thanks for Marking this Answer
Akbar_u2u
Answer
# 7 assuming free board=150mm=.5feet
hence height=4.5feets
now total volume=5*5*4.5=112.5cubic feet
hence112.5/35.28=3.18cubic metres
now 1metre cube=1000litres
hence 3.18*1000=3180litres
Is This Answer Correct ? 22 Yes 8 No
Sachin Kesarkar
Answer
# 8 125.000 Cubic Feet = 3,539.606 Litres
Is This Answer Correct ? 16 Yes 5 No
Prashankumar
Answer
# 9 volume is calculated as
1)for circular tank
v = 3.412/4 X d2 x height of tank
2) for rectangular tank
v = l x b x h
| Is This Answer Correct ? | 17 Yes | 7 No |
Post New Answer View All Answers
List out the potential risk factors for workers on the construction site?
What is a bearing capacity of soil?
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
what is the water cement ratio for plastering
Pls provide me with the calculation or codes related to de- shuttering of flat slabs
What is pre-stressed concrete?
Why are separation membranes used between concrete pavement slab and sub-base?
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed
procedure for preliminary selection of size of column of 5 storey building
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
What is progress payment?
give me the rate analysis for Bituminous Macadam and SDBC