Answer Posted / sandeep
Mould Oil, Shuttering Oil etc.
| Is This Answer Correct ? | 5 Yes | 4 No |
Post New Answer View All Answers
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m
to minimize budget cost of building , what can i do
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
What is the effect of a building collapse?
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
Time required for curing of wall tiles before fixing
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
what is meant by shear center?????
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
what is the clear cover for shearwall?
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)
How many litres of water used for curing of 1000sqft of slav