What"s mean by water bound macadam road(WBM)?
Answer Posted / faisal
pavement base course made of broken or crushed aggregate mechanically interlocked by action of rolling and the voids filled with screening and binding material with the help of water.
| Is This Answer Correct ? | 14 Yes | 8 No |
Post New Answer View All Answers
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
Explain what is alternate bid?
Why concrete barriers have curved surface profiles?
Detection of a beam & a girder areββββ
What is an object snap mode?
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
Define What is a projection line?
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high
How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me
Formula for calculation volume of essentric footing
What you understand by richter scale?
What is bmc stands for in bmc software?