how can we convert 48V dc into 12 V dc? Any standard device
for it??
Answer Posted / ramachandran
Buck converter is used
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is a system?
what is difference between cpp electrical system and refinery electrical system
Why slip ring ind. motor power consumption is low compare to induction motor .same 90 kw motor used same load output
how dia of wire and angles are calculated for overhead shielding wire to protect substation equipment from lightening strokes???
what is the working principle of energy saver control panel. please give the complete calculation & theory.
any one can explain the stages of a knee point which is taken during ct magnetising curve.
list of tests to be carried out at manufacturers end while purchasing a step up transformer of 11kv to 66kv ,2MVa Capacity.
hi, i have 3x200KVA and 2 x 80KVA UPS with battery bank of 150AH 68Nos. and 100AH 204Nos., i need to install AC either ductable or PAC type, so can you help me to calculate heat load and capacity of the AC to install.
can we use ZNyn11 transformer instead of Dyn11 transformer in distribution for effectively eliminating harmonics from the industrial loads.
Zone of protection and tripping scheme of arc protection relay.
As we use capacitior bank in 3ph ckt for improvement of PF, why not we use capacitor in single phase domestric use, at our house their are many inductive equipments,like fan,mixer,tube choke,air conditioner they also draw PF... by using capacitor can they improve PF. if yes--what are advantage and how to connect a capactor in single ph,and which type of capacitor if no- what are disadvantages.
A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram
Tell me about ur past electrical maintanence job
i karmveer bharti persuing b.tech . plz send me syllabus and name of reference books. for preparation of section eng.
How does HT work & Voltage required?