how to calculate 1:1.5:3 ratio concrete cement, sand, metal
and water please give me brief calculation
Answer Posted / sunil notiyal
M20 = 1:1.5:3
Volume = 1+1.5+3=5.5
Total volume ingredients for using =1.57
Volume of broken stone Require = (3/5.5) x 1.57 = 0.856 m3
Volume of sand Require = (1.5/5.5) x 1.57 = 0.471 m3
Volume of cement = (1/5.5) x 1.57 = 0.285 m3
= 0.285 x1440 = 411 kg
For 1m3 of M20 (1:1.5:3)
Broken stone = 0.856 m3
Sand = 0.472 m3
Cement = 8.22 bag
| Is This Answer Correct ? | 27 Yes | 8 No |
Post New Answer View All Answers
whats is difference between anchorage length and development length
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
what does the track parameter mean in staad.pro?
What are the different types of runners?
How do we calculate the power of centrifugal pump?
115mm thickness brick work how to required mortar
what r you reqired for concrete baching plant?
whou haat goals do you have in your career
Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?
Floor tile measurement? Wall to wall or skirting to skirting
what is kribs is supporting?
rate analysis for cement pointing 1:4 , for 100 sq m
what is project?
what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/
Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?