While Calculating Quantity Of cement,sand,Metal we get cement in no of bags,Where Sand & Metal we get in Meter Cube(M3)how to convert it to Units(i.e in no of lorry's or Tractors )
Answer Posted / santosh
0.0347
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
Doul Bar reinforcement and details of drawing.
Which type of plywood & sizes using in construction projects ?
how lap length is increased with increase of Grade of steel?
what is kribs is supporting?
Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000
Explain the advantages and disadvantages of using plastic and timber fenders?
what is the maximum number of course that can be laid according to IS code and the max height.
What are the joints wants to made in masonry where door opening, arches like etc..
what values & beliefs have guided you in your career path
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
what is smart building materials?
what is diversion?
Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.