Answer Posted / vikram malik
Session device error occurs normally with sub-files
whenever we are going to
1. Incorrect record number in subfile SFLRCDNBR
2. Trying to show empty subfile
3. Field and position in display file are matching
4. Trying to write more than 9999 records
| Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
what is a rpg?
how do I play {insert rpg system here}?
Interviewer asked me write down DDS for load all subfile .can anybody write dds
explain sflclr, sflend, sfldlt, and sflcsrrrn?
How Chain operation copies the record's data to the input buffer for the program?
Explain mdt?
how do I preserve and clean the array?
how do I declare a table or array in rpg iv?
What is the diff bw PF/LF Name and their Record format name? what is restriction in record format then file name?
Please tell me how to read the records from a file with load an array of size with error conditions(The logic answer for this question is ARR is array of 99 elements Z-ADD 0 IDX *LOVAL SETLL FILE READ FILE 99 *IN99 DOWEQ *OFF IDX ANDLT 99 ADD 1 IDX MOVE FIELD ARR,IDX READ FILE 99 ENDDO).So,Please give me the complete of this code.
How do u design a physical file, when you have 2 Unique fields like for eg in A student file student ID and student examination no both are unique
do you use message subfiles? What are the necessary keywords required coding a message subfile?
Suppose we have one database file and it is used by 5 programs and in 3 program we have to add some records in datbase file s what is the impact on other program?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.
what is the use of sflnxtchg?