Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

TNC switch is also available in 1NO+1NC. What does it mean ?

Answer Posted / k.prakashchandra

They ,being stay put switches ,act as semaphore indicators also

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Why Ac Systems Are Preferred Over Dc Systems?

1354


why to use freewheeling diode ( diode in revers bias mode) across dc coil

5099


Connection diagram for KW meter and  Kva meter

2403


can i use ups power as a raw power for another ups

2027


what is meant by power and distribution transformer ?

2049


could anybody able 2 send me jindal steels previous papers fr electrical steam....pls send 2 my id if possible....sirisha.shaik@gmail.com

2133


How can we findout the maximum efficiancy of Transformer? At which load?

2136


How to identify the start and end of 3phase 12 lead motor if U1, U2, etc numberings are lost or erased.

2217


what is the necessity of under ground cables ??

2140


If a rotary UPS is in line through grid power; What would be the impact on Power Factor if the load through rotary ups is 25% , 50% , 75% & 100%. Will the power factor reduce with less load?

1922


why we have and use 3 phase not 2 or 4 or other in power system?

2167


IN SINGLE PH TRANSFORMER IF LEKAGE IMPEDANCE DROP IS NEGLECTED ,THE FLUX IN THE MAGNETIC CORE and the lekage flux linking a winding are a)proportional to the applied v to the winding i respectively.

2169


How can we design a HVAC Plant room which includes AHU,FCU,Chillers,Cooling towers, Pumps etc & how will they work? any Drawing if possible?

2393


what are the accessories need to be added while doing estimation for the following: 1.MCCB 2.MCB 3.ACB

2136


what is difference between line differential and transformer differential?

1786