concrete cube strength if fail 1 no in 7 days .What is the
solution
Answer Posted / deoghar
If 07 days concrete fails then ,it does not mean that concrete strength is poor ,7 days result is just a check of quality of concrete.Test 28days result.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the difference between linear dimension and aligned dimension?
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
what will happen if one could not properly follow the spacing of slab reinforcement bar?
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
what is the composition of good brick ?
how to calculate load for a bungalow and 1column carry how much load if the size of column ,9"*15" .....or total structure load......
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
Explain what is zoning permit?
how gradation of aggregates effect on slump of fresh concrete?
Gidc technical que paper
whats is difference between anchorage length and development length
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
Write short note on construction programme for pile foundation.
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft