Answer Posted / ruchita raj
1:1:1
| Is This Answer Correct ? | 3 Yes | 11 No |
Post New Answer View All Answers
How is calculate the cube molt
Explain the design for rcc multi-storied building?
Please tell me vasthu room sizes. Thanks.
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
What will be weight of 0.5mm GI sheet per sq.ft?
In which code the the maximum height of concrete casting has been explained
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
What is the basic difference between OPC
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
Slab quantity
What is difference between combin footing & rapt footing