12mm diameter iron bar having 1m length how much kg weighted ?
Answer Posted / bharath m/8438238335
0.888 Kilograms Per 1 m Length theoretically.
Actual weight may vary within the Rolling Margin permissible.
| Is This Answer Correct ? | 20 Yes | 0 No |
Post New Answer View All Answers
What are moment of inertia and its importance in civil engineering?
What is the meaning of soil reinforcement?
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
Floor tile measurement? Wall to wall or skirting to skirting
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
What are the different types of civil engineering?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
What is the development length given in pile?
Explain moment of inertia?
What is componsation
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.