beam is fixed at both end which is 8 m span carry udl of 10
kn/m at left half span.there is internal hinge at
center.what is reaction at center
Answer Posted / sajal garg
7.5KN
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
Define What is rigging?
How to determine thee cut length for steel reinforcement bars in R.C.C design
Explain what is structural frames or systems?
For fine aggregate which is most suitable River sand or crusher sand & why ?
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
how find the cut length of tringular ring and any formula find out the quantity of circular brick work
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement
can i get civil engineering test papers.......?????
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
why is M30 grade Concrete use for Foothing & Column M50
Which code is used for tor & tmt steel bar?
Which are the top apps for you civil engineering?
what is the method used for marking of cantilevers in hirise buildings by using theodolite