for 1sft of Cement plastering ratio 1:3 How much quantity
of cement and sand required.?
Answer Posted / rahul
cement 1 nd sand 3
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
Stringer How many cm goes to landind
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
pls give me some basic informations in construction of a structure?
how much cement and sand required for 1cum rr masonry
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
What is the purpose of the gap in the road on this bridge?
why the openings of sieves are square io size?
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
How u can calculate the Octagon ring distance from center of raft in 275 mtr chimney slipform errection? cantact no:0993455097
what is w/c ratio in dry lean concrete for m10 mix design
how to find out hard strata in bored pile when the DMC method adopted.
what is right & short method of measurement of slab&beam
is basic cost of the material includes tax?
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
what is difference between fluidity and workability also how palsticizer works