how many bricks are required for masonary trench having
length of 31 mtr, depth of 0.6 mtr and breadth of 0.45 mtr
on single brick work as well as double ( 9" ) brick work
Answer Posted / suresh s sonone
4185 nos req
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
plz.show development and anchorage length in simple diagram.
is concealed wiring a problem in fly ash brick wall?
The largest size of paper used in plotter to print the drawing made by Autocad .
very simple or less time consuming formula for reinforcement calculation by moment
estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
how to convert cement, sand aggregate quantity from M3 to kg with full description?
what radial pressure, the NP2 class rcc pipe can sustain?
How to find the cuplock pipe qty in staging for Minor bridge?
what is the difference b/w full length and cutting length?
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
where can i get the previous question papers for rrb section enginerr (civil)
How to avoid fly ash seed ball formations in the concrete mixer while mixing of raw materials for fly ash block manufacturing?