why only water cement ratio always......why not water sand ratio while making concrete
Answer Posted / gowtham1993
For higher-strength concrete, lower water:cement ratios are used, along with a plasticizer to increase flowability. Too much water will result in segregation of the sand and aggregate
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
give me the mix proportion for design mix concrete M 7.5 grade 1:4:8
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
Slab quantity
difference between trapezoidal and pedestal footing and how the load acts on that
How to calculate the force on a column of three story building. What should be the base concrete height?.
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
what is the tensile strength of 10swg and 8swg gabion wire?
what do you know that m20,m25
how do you calaculate the total steel quantity of an rcc building using thumb rule?
what is the basic difference between Coloumn & Shear Wall
What is the purpose of Chipping in the heavy foundation?
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
For fine aggregate which is most suitable River sand or crusher sand & why ?
Whats the meanig of ,'K' VALUE in the case of soil.....