What is the difference in Cement content for M-20 Concrete
if y ou use OPC & PPC?
What is the difference in the Curing Period?

Answer Posted / darshandachchu@gmail.com

for opc =10 days
for ppc=14 days

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?

1852


how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.

3337


How do you prepare Material Recovery Statement for deduction from contractors bills?

1113


how to do sudoko puzaals?

1840


How much cement,sand,bricks and water needed for 1square metre brick work?

1349






IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI

1598


Explain moment of inertia and its importance.

667


For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38

1423


At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.

1697


what is the use of beam end forces while using a staad ? wha they are show

2484


1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?

6117


What is the origin of name railway sleepers?

849


What are the uses of alloys in daily life and how are alloys made?

870


which software is better for design and analysis of buildings (stadd pro ) or (Etabs)

1844


How much for the BRC lapping in full yield and half yield < and which table to get it ?

2038