how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
how do you stabilize a waterlogged area in road construction
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
how many spacers we need for 1 ton reinforcement? aprox.
what is the formula for Mass of cement grout (Dg)=???
i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like
what is mean by reestimation?
what is the difference between np2 and np3 concrete mix
how to find ssm in foundation?
what are the changes in concrete pour height as per IS 456, 2009?
What is difference between limit state and working stress method? How it is applies in building structure.
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
What is need for setting limits?
What is the cost difference between site mix and ready mix concrete per cubic meter