clear cover means the distance between main bar outer face to shuttering face. Is it right?
Answer Posted / k.karunamoorthy
Yes
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How to do bbs in excel format
can you give me the details of rate analysis of steel and concrete?
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
400 ku d/c clearess ketan hota hai?
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick
Water filter calculation formula
Cement consumption of one cubic meter of aerocon blocks masonry?
How to find permissible diagonal tensile stress in reinforced brick work
What are the different types of runners?
The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it
What are the advantages and disadvantages of lead products in construction?
what will happen if one could not properly follow the spacing of slab reinforcement bar?
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)